A lot of work (and fishing) was accomplished that trip, including the decking for the front steps, three log treads for steps fabricated and installed, the 2x6 partition in the Mud Room constructed, peg board for tools on the wall and assembly of the work bench was completed. The water pump plumbing was modified with a check valve to protect the pump from “hydraulic hammering” and a priming by pass circuit added as well as a cutoff valve replacement for a simple cap on the priming inlet. We delivered the new LP refrigerator to the island this trip and found it to be so heavy to move that Don was motivated to build a two wheel cart for transporting it to and from its hiding spot.